Is pre-calculated taxable income included in the construction cost estimate? Construction cost management is a top legal and financial concern for investors, contractors, and project accounting teams. This is especially true in the context of increasingly stringent construction investment cost management under the new legal system. Construction Law No. 135/2025/QH15, Decree 206/2026/ND-CP, Circular 36/2026/TT-BXD and Circular 38/2026/TT-BXD, Therefore, a thorough understanding of the cost structure in budgeting is a mandatory requirement to ensure compliance and optimize finances.
Many businesses, during the construction and final settlement phases of projects, often struggle with the discrepancy between accounting for construction cost estimates and the basis for calculating actual taxes. Misunderstanding or omitting pre-calculated taxable income not only directly impacts the contract price but also carries the risk of penalties from tax authorities during audits. This article will provide a detailed analysis of current regulations, methods for determining tax rates, and the most effective tax risk management solutions.
Summary of key points regarding pre-calculated taxable income in construction cost estimates.

- Whether pre-calculated taxable income is included in the construction project budget is clearly defined in Clause 2, Article 12 of Decree 206/2026/ND-CP: This is an expense included in the construction costs within the construction project budget.
- This amount represents the expected profit of the construction contractor, determined by multiplying the percentage rate (%) according to Section 4 of Appendix III issued with Circular 36/2026/TT-BXD by the total direct and indirect costs. This regulation applies to all investors, contractors, and cost estimate appraisal agencies when implementing construction projects in Vietnam.
Is pre-calculated taxable income included in the construction project budget?

Current legal regulations affirm that taxable income is calculated entirely in advance. CALCULATED This amount is included in the construction cost estimate. It is part of the construction cost structure, within the total investment level or the approved project estimate.
The direct legal basis for this issue is found in Article 12 of Decree 206/2026/ND-CP regulating the determination of construction project estimates.
The basis for determining the construction cost estimate is according to Clause 1, Article 12 of Decree 206/2026/ND-CP.
The construction cost estimate is regulated in point a, clause 2, Article 76 of the Construction Law No. 135/2025/QH15. Based on clause 1, Article 12 of Decree 206/2026/NĐ-CP, the cost estimate is determined on the following legal and technical grounds:
- The volume of calculations is derived from the construction design and implemented after the project is approved.
- Technical specifications, work requirements, and project implementation plan.
- Construction conditions and actual construction methods of the project.
- Referencing and using construction price systems, equipment prices, and construction price indices published by competent state management agencies.
- Market prices, manufacturer's prices, supplier prices, or calculations from similar cost data of completed or ongoing domestic projects, along with regulations and guidelines on cost determination.
Construction cost structure according to Clause 2, Article 12 of Decree 206/2026/ND-CP
According to Clause 2, Article 12 of Decree 206/2026/ND-CP, construction costs in the project estimate consist of five main components:
- Direct costs: These include the cost of materials, labor, and construction machinery and equipment.
- Indirect costs: These include overhead costs and costs for certain tasks whose quantities cannot be determined from the design. Indirect costs are determined by a percentage-based rate (%) as stipulated or by preparing an estimate.
- Pre-calculated taxable income: Determined by a percentage rate (%) as prescribed.
- Value Added Tax (VAT): Determined according to current tax laws and regulations.
- Costs for temporary housing and construction management: Determined by a percentage rate (%) as per regulations or by preparing an estimate.
Method for determining direct costs at each design stage.
According to point a, clause 2, Article 12 of Decree 206/2026/ND-CP, direct costs are determined on a case-by-case basis for each specific design:
- In cases where the design is implemented after the project is approved, such as FEED design or engineering design: Direct costs are determined based on the volume and construction price of the construction work group, the price of structural components and units, the price of construction work, and the cost rate.
- In cases where the construction design is implemented after the project is approved, specifically in the form of construction drawings: Direct costs are determined based on the volume and price of construction work, the construction price of the construction work group, and the price of structural components and units of the project.
- In cases where, at the time of budget preparation, the cost of works cannot be determined from the quantities and construction prices as stipulated above: The cost will be estimated based on the content, scope, and nature of the work. During the subsequent implementation steps, the investor will clarify this cost to serve as a basis for management.
Therefore, pre-calculated taxable income is not an unforeseen expense or a financial penalty. It is a projected profit already included in the project value to ensure the legitimate business performance of the construction contractor.
Specifically, the overall construction cost estimate is compiled from five constituent cost components, including:
- Direct costs: The total cost of construction materials, direct labor costs, and costs of using construction machinery and equipment.
- Indirect costsThis includes the total cost of site management and expenses for certain tasks whose specific quantities cannot be determined from the design drawings.
- Pre-calculated taxable income: The projected profit margin for the construction contractor, calculated according to government-regulated standards.
- Costs for temporary housing and construction management.Expenses for temporary facilities serving the living needs of workers and for management and operation at the construction site.
- Value Added Tax (VAT)Value-added tax (VAT) obligations are calculated at a prescribed rate on the total value of pre-tax expense items.
How to determine pre-calculated taxable income according to Circular 36/2026/TT-BXD
Formula for calculating pre-tax income
In Section 4 of Appendix III issued with Circular 36/2026/TT-BXD, the Ministry of Construction provides specific guidance on how to calculate this item in the construction cost estimate as follows:
Pre-calculated taxable income is determined by multiplying the percentage rate (%) specified in Table 3.6 of Appendix III by the total direct and indirect costs.
The formula for accurate determination:
|
Pre-calculated taxable income = (Direct costs + Indirect costs) x Percentage rate (%) |
Table of pre-calculated percentage rates for taxable income
In Table 3.6 of Appendix III issued with Circular 36/2026/TT-BXD, the percentage rate (%) of pre-calculated taxable income is specified in detail for each type of construction project as follows:
| STT | Type of construction | Pre-calculated taxable income threshold (%) |
| 1 | Civil engineering | 5,5% |
| 2 | Industrial buildings | 6,0% |
| 3 | Transportation infrastructure | 6,0% |
| 4 | Agricultural and environmental projects | 5,5% |
| 5 | Technical infrastructure works | 5,5% |
| 6 | Cost estimation for the installation of technological equipment in construction projects; construction of power transmission lines and substations; testing and calibration of power lines and substations. | 6,0% |
Specific cases regarding pre-calculated taxable income limits.
Circular 36/2026/TT-BXD also clearly stipulates two specific application cases that cost estimators and tax accountants need to be aware of:
Firstly, in cases where the construction contractor is responsible for independently exploiting and producing materials such as soil, stone, sand, and gravel to serve the construction project, the taxable income calculated in advance in the cost estimate for the exploitation and production of materials is determined by a rate of 3.0% on the direct and indirect costs of that exploitation and production activity.
Secondly, for construction projects serving national defense and security, depending on the type of project (civil, industrial, transportation, infrastructure, etc.), the investor and the cost estimator shall apply the percentage rate (%) specified in Table 3.6 of Appendix III accordingly.
Management and use of construction project cost estimates according to Decree 206/2026/ND-CP and Circular 38/2026/TT-BXD
Guidelines for application and basis for establishing norms according to Circular 38/2026/TT-BXD
Circular 38/2026/TT-BXD provides detailed guidance on how to apply construction cost estimation norms, as well as the legal and technical basis for establishing these norms.
According to Circular 38/2026/TT-BXD, construction cost estimates are determined based on:
- The technological process of construction and the economic and technical characteristics of each construction task.
- Requirements regarding the type and quality of materials, the skill level of the workforce, and the actual productivity of construction machinery.
- Market price levels and common construction conditions.
Compliance with Circular 38/2026/TT-BXD helps investors and consultants accurately determine the volume of materials used, providing a basis for precisely calculating direct costs, indirect costs, and pre-tax income in the project estimate.
Regulations on the management and use of budget norms are governed by Clause 5, Article 20 of Decree 206/2026/ND-CP.
Based on Clause 5, Article 20 of Decree 206/2026/ND-CP, the management and use of construction cost estimates during project implementation are carried out according to the following four core regulations:
- Firstly, during the process of preparing the total investment cost and construction budget, the investor, organization, or individual preparing the budget may apply, utilize, and adjust the budget norms based on the system of norms issued by competent state agencies or based on the construction technology, construction methods, expected construction conditions, and construction organization to determine the norms.
- Secondly, during the construction process, the investors of public investment projects shall organize surveys, collect and determine the estimated cost norms for construction works that do not have norms or have norms but are not suitable for the actual project, according to the method of determining norms guided by the Ministry of Construction; and send them to the Ministry of Construction and the agency that issued the norms for review, consideration and decision on updating the construction norm system.
- Thirdly, the investor organizes surveys, collects data, and determines the estimated cost norms for the project according to the requirements of the competent state management agency that issues construction norms for construction works with new construction technologies and new materials, in order to serve the review and updating of the construction norm system.
- Fourth, for large-scale public investment projects with complex technical requirements and the use of new technologies not yet widely available in Vietnam, if foreign norms are used to conform to the standards and technologies applied to the project, the investor shall organize the collection and translation of foreign norms, and hire a competent and experienced consulting organization to analyze, evaluate, and determine the list and contents applicable to the project. The investor shall then decide on their use as a basis for determining the project's construction investment costs; and simultaneously compile a report to be submitted to the investment decision-maker for monitoring and management. During the construction process, the investor shall organize surveys and collect data to verify the norms used; and send the results to the Ministry of Construction, the Ministry managing specialized construction projects (for norms related to specialized construction projects), and the Provincial People's Committee (if it is the investment decision-making authority) to facilitate the review and updating of the construction norms system.
The economic nature and impact of pre-calculated taxable income on tax liability.
Distinguishing between taxable income calculated in the budget and actual corporate income tax.
A very common mistake made by many construction accountants is equating the pre-calculated taxable income in the cost estimate with the contractor's taxable profit for corporate income tax purposes.
In construction cost estimates, the pre-tax income is a hypothetical standard figure stipulated by the State to constitute the pre-tax value of the project. This figure serves as the basis for the investor to approve the bid price and sign the construction contract.
In financial terms, a contractor's profitability depends on their ability to manage construction costs. If the contractor saves on materials, optimizes labor and machinery, the actual profit earned may be higher than the taxable income projected in the initial estimate. Conversely, if construction is prolonged and material prices fluctuate, the contractor may experience a decrease in profit or even incur losses.
Regarding tax obligations, the tax authorities determine... corporate income tax Tax must be paid based on actual taxable income (actual revenue minus reasonable and legitimate expenses with sufficient invoices and supporting documents) according to the Corporate Income Tax Law, and not directly based on the pre-calculated taxable income figure in the budget.
Impact on VAT and financial invoices
Pre-tax income serves as part of the pre-tax construction value. Total direct costs, indirect costs, pre-tax income, and temporary housing costs will constitute the pre-tax construction value.
VAT The value of a construction project is calculated by multiplying the pre-tax construction value (including pre-tax taxable income) by the current VAT rate.
When the contractor issues a VAT invoice based on the progress of completed work acceptance or upon final settlement of the contract, the VAT taxable value recorded on the invoice must fully include the acceptance value corresponding to these items.
|
ACCEPTANCE VALUE ON INVOICE = [Direct costs + Indirect costs + Pre-tax income + Temporary housing costs] + [VAT calculated on the total of the above items] |
Compilation of legal documents regulating construction cost estimates and taxes.
To accurately determine pre-tax income and manage the financial aspects of a construction project, businesses need to refer to the following legal regulations:
| Document number | Text type | Issuing authority | Related content summary |
| Law No. 135/2025/QH15 | Construction Law | National Assembly | General regulations on construction project cost estimation and investment cost management are specified in point a, clause 2, Article 76. |
| Decree 206/2026/ND-CP | Decree | Government | The regulations stipulate the basis for determining the budget in Clause 1, Article 12, the cost components in Clause 2, Article 12, and the management and use of norms in Clause 5, Article 20. |
| Circular 36/2026/TT-BXD | Circular | Ministry of Construction | Instructions for determining pre-calculated taxable income are provided in Section 4 of Appendix III, Table 3.6, which specifies the % rate and regulations for cases of self-production of materials for national defense and security. |
| Circular 38/2026/TT-BXD | Circular | Ministry of Construction | Guidelines for applying construction cost estimation norms and the basis for establishing construction cost estimation norms. |
| Current Corporate Income Tax Law | Law | National Assembly | The regulations regarding the basis for calculating corporate income tax are based on taxable income from revenue and reasonable expenses. |
| Current Value Added Tax Law | Law | National Assembly | The regulations stipulate that the VAT taxable value for construction and installation is the value of the completed work, excluding VAT. |
A real-world case study in Vietnam: Risks of cost breakdown and tax settlement in construction projects.
To clarify the importance of correctly understanding pre-calculated taxable income, let's analyze a real-world case study at Nam Ha Construction Joint Stock Company (company name changed) during a recent tax settlement period.
Project context
Nam Ha Company won the bid for the construction of an industrial factory in Binh Duong with a lump-sum contract value of 50 billion VND.
In the cost estimate attached to the contract, the expenses are calculated in accordance with regulations and include:
- Direct costs: 38 billion VND
- Indirect costs: 4 billion VND
- Temporary housing cost: 0.8 billion VND
- Pre-calculated taxable income (6.0% according to Circular 36/2026/TT-BXD): 2.52 billion VND
- Pre-tax value: VND 45.32 billion
- VAT (10%): 4.532 billion VND
- Total contract value: 49.852 billion VND
Problems arise when the tax authorities conduct an audit.
During a corporate income tax audit, the inspection team discovered that Nam Ha Company recorded the entire pre-tax income of VND 2.52 billion into the "received in advance" revenue account immediately upon signing the contract, and failed to gather sufficient invoices and supporting documents for the corresponding input costs for the actual direct construction expenses.
The company explained that the 2.52 billion VND was a fixed profit already approved in the budget, and therefore automatically constituted their net income, eliminating the need for invoices based on progress or explanations of corresponding direct expenses.
Assessing and managing risks from an expert's perspective.
From MAN's perspective, Nam Ha Company committed two serious errors in accounting and tax management:
- Misunderstanding the nature of cost estimation: The pre-calculated taxable income in the budget only serves as a basis for the contracting party to determine the payment value to the contractor. This amount does not reflect the actual taxable corporate income on the books.
- Discrepancies in the timing of revenue and expense recognition: Revenue from construction services must be recognized according to the progress of acceptance of completed work, combined with the corresponding reasonable and legitimate cost aggregation.
Actual figures adjusted after inspection:
| Target | Data as reported by the company. | Data after inspection by the Tax Team. | Difference / Processing |
| Actual revenue | 45,320,000,000 VND | 45,320,000,000 VND | 0 VND |
| Reasonable expenses with invoices | 35,000,000,000 VND | 35,000,000,000 VND | 0 VND |
| Direct costs lacking supporting documentation. | 7,000,000,000 VND | 0 VND (Excluded from expenses) | -7,000,000,000 VND |
| Profit subject to corporate income tax | 3,320,000,000 VND | 10,320,000,000 VND | +7,000,000,000 VND |
| Additional Corporate Income Tax Payable (20%) | – | 1,400,000,000 VND | A sum of 1,400,000,000 VND is being collected. |
| Penalties for late payment and administrative violations. | – | 320,000,000 VND | Penalties will be imposed according to regulations. |
Thanks to timely troubleshooting support from MAN – Master Accountant Network, Nam Ha Company reviewed all acceptance documents, supplemented the handover minutes, construction logs, and non-cash payment documents, successfully explained and reduced the number of excluded costs, and minimized the penalty amount.
Comparison table of estimated taxable income versus estimated expenses.
To help managers and accountants easily distinguish between the two, the following comparison table clarifies the differences between pre-tax income and other cost components in a construction project estimate:
| Criteria | Pre-calculated taxable income | Direct costs | Indirect costs |
| Nature | The contractor's projected profit margin. | The actual cost of materials, labor, and machinery to create the project. | General management and operating costs for the contractor and the construction site. |
| Basis for determination | The ratio % specified in Table 3.6, Appendix III of Circular 36/2026/TT-BXD multiplied by (Direct costs + Indirect costs). | The design volume is multiplied by the corresponding construction cost according to Articles 12 & 22 of Decree 206/2026/ND-CP. | Calculated according to the prescribed % ratio or by preparing an estimate as per point b, clause 2, Article 12 of Decree 206/2026/ND-CP. |
| Documentation required during tax audits. | Estimate documents, construction contracts, and work volume acceptance reports. | VAT invoices for purchased materials, labor payroll records, and equipment rental contracts. | Bills for utilities (electricity, water), office supplies, and business management expenses. |
| Purpose in management | Ensure the expected profit margin for the contractor. | Control actual construction costs. | Optimize the operational and project management system. |
Expert analysis from MAN: Costly mistakes and strategies for optimizing tax risk.
Solutions from MAN – Master Accountant Network show that, during the process of consulting and auditing for more than 500 construction companies in Vietnam, experts have identified the three most common mistakes that business owners often make:
Omitting taxable income from calculations before preparing supplementary estimates or contract addendums.
When additional work is performed outside the contract scope, accountants or engineers preparing cost estimates often only calculate material and labor costs, forgetting to multiply by the pre-calculated taxable income rate as stipulated in Circular 36/2026/TT-BXD. This results in the contractor losing between 5.5% and 6.0% of their legally entitled profit margin.
Confusion between the pre-calculated taxable income ratio and the corporate income tax rate.
Many contractors mistakenly believe that including the estimated taxable income of 5.5% – 6.0% in their cost estimates fulfills their corporate income tax obligations. In reality, this rate is only used to determine the contract value. Businesses are still required to pay 20% in corporate income tax on the actual profit earned, according to the current Corporate Income Tax Law.
Failure to compare the progress of invoices issued with the approved budget.
When issuing invoices based on payment stages, accountants often fail to allocate the correct proportion of pre-calculated taxable income corresponding to the completed work volume. This makes it difficult to explain discrepancies between VAT and corporate income tax revenue and the project's final settlement documents.
Advice from MAN experts: Construction companies need to establish a close coordination process between the Engineering-Estimating department and the Accounting-Taxing department right from the bidding stage. All cost items in the estimate must be tracked accordingly in the accounting system to ensure that during tax audits, all input costs have valid invoices proving the value of the project that has been invoiced.
Conclude
Whether pre-taxable income is included in construction project estimates has been clearly defined by law: This is a mandatory component of construction costs according to Decree 206/2026/ND-CP, Circular 36/2026/TT-BXD, Circular 38/2026/TT-BXD, and Construction Law No. 135/2025/QH15. Understanding the economic nature and legal regulations of this item correctly helps businesses accurately determine the bid price, protect their legitimate profit margin, and avoid potential legal risks.
Tax services at MAN – Master Accountant Network
- Tax accounting services
- Tax consulting services
- Tax settlement services
- Tax reporting services
- VAT refund service
Service contact information at MAN – Master Accountant Network
- Address: No. 19A, Street 43, Tan Thuan Ward, Ho Chi Minh City
- Mobile/Zalo: 0903 963 163 – 0903 428 622
- E-mail: man@man.net.vn
- Google Business Profile: View MAN – Master Accountant Network's Google Business Profile
- LinkedIn Founder: View expert Le Hoang Tuyen's LinkedIn profile.
Responsible for production and professional content review by: Mr. Le Hoang Tuyen – Founder & CEO of MAN – Master Accountant Network, CPA Vietnam with over 30 years of experience in accounting, auditing, taxation, and corporate financial consulting.
Frequently Asked Questions (FAQ) regarding pre-calculated taxable income in construction cost estimates.
What is the pre-calculated taxable income in the construction project estimate (%)?
The pre-calculated taxable income rate ranges from 5.5% to 6.0% depending on the type of construction project (civil engineering 5.5%, industrial 6.0%, transportation 6.0%, agriculture and environment 5.5%, technical infrastructure 5.5%, installation of equipment/construction of power lines and substations 6.0%) according to Table 3.6, Appendix III of Circular 36/2026/TT-BXD. However, in the case of self-extraction and production of materials such as soil, stone, sand, and gravel, the rate is 3.0%.
Does privately built family home count as pre-taxable income?
For individual household housing projects undertaken by households without using state budget funds, the preparation of cost estimates is not required to comply with Decree 206/2026/ND-CP and Circular 36/2026/TT-BXD. However, if a construction contractor is hired under a contract, the contractor will still include this profit margin in the total contract value.
Is the pre-calculated taxable income the same as the corporate income tax that the contractor has to pay?
No. Pre-calculated taxable income is the projected profit included in the project price. Corporate income tax payable is calculated by multiplying 20% by the actual taxable income (actual revenue minus reasonable expenses) recorded in the contractor's accounting books.
If the project estimate does not include pre-calculated taxable income, is that a violation of the law?
For projects using public investment capital or non-public state investment capital, preparing cost estimates that do not comply with the regulations in Article 12 of Decree 206/2026/ND-CP constitutes a violation of cost management regulations, and the estimates will not be approved by the relevant specialized agency. For private capital projects, the parties may reach a mutual agreement, but adherence to the standard framework is still encouraged.
Is VAT calculated on pre-calculated taxable income?
Yes. The VAT taxable value of a construction project is the total value of the project before tax acceptance, which includes direct costs, indirect costs, temporary building costs, and pre-tax taxable income.